deviation factor造句
例句與造句
- Beam deviation factor
電子束偏移因數(shù) - On the basis of these theories , the no - loading emf of powerformer is analyzed and the no - loading waveform deviation factor is taken out , in the conditions of considering the influence of damping winding and not considering it
在這些理論基礎(chǔ)之上,分析了考慮阻尼繞組影響與不考慮阻尼繞組影響兩種情況下電力發(fā)生器的空載感應(yīng)電勢,求取了空載電勢波形畸變率。 - Considering the influence of damping winding and if core is saturated or not , the no - loading emf waveform of a conventional generator having the same size with the prototype ( except the stator slot ) is analyzed , and the waveform deviation factor is taken out
對一臺具有與電力發(fā)生器樣機(jī)相同尺寸(除定子槽形)傳統(tǒng)發(fā)電機(jī)的空載電勢波形進(jìn)行了分析。分析了不考慮鐵心飽和、考慮阻尼繞組影響和考慮鐵心飽和、考慮阻尼繞組影響兩種情況下,它的空載感應(yīng)電勢,求取了空載電勢波形畸變率。 - According to the no - loading waveform deviation factor , the prototype conforms to the national design standard and practical needs in the engineering . more important , the high voltage is achieved . in the condition of considering core saturation and damping winding influence , the influence to powerformer of the no - loading tooth harmonic emf is smaller than conventional generator , and the waveform deviation factor of the former is smaller , too
由求得的樣機(jī)空載電勢波形畸變率可知,該樣機(jī)滿足國家設(shè)計標(biāo)準(zhǔn)和工程實用要求,更重要的是,實現(xiàn)了產(chǎn)生高壓的目的;考慮鐵心飽和、考慮阻尼繞組影響情況時,電力發(fā)生器與具有相同尺寸(除定子槽形)的傳統(tǒng)發(fā)電機(jī)相比,空載齒諧波電勢對電力發(fā)生器的影響較小,前者的空載波形畸變率較小。 - At first , the soft of bridge structure , gqjs , is used to calculate the structure of prestressed concrete continuous beam bridge and the deformation and stress of the concrete box beam are given out ; then by measuring and analyzing the datum of the stress in the prestressed steel rope and the stress of section in the concrete box beam , this article presents two ways to identify the reasonable friction deviation factor k between longitudinal prestressed tendons and the wall of duct ( indirectly and directly ) , and discover the regular pattern of prestressed friction loss
首先運(yùn)用橋梁結(jié)構(gòu)分析專用軟件gqjs對預(yù)應(yīng)力混凝土連續(xù)梁橋進(jìn)行結(jié)構(gòu)計算,得到了各施工工況下混凝土箱梁的撓度和截面應(yīng)力;然后給出了識別引起結(jié)構(gòu)預(yù)應(yīng)力損失的孔道偏差系數(shù)k的兩種方法(間接法和直接法) 。通過對測得的預(yù)應(yīng)力索沿程應(yīng)力和混凝土箱梁截面應(yīng)力數(shù)據(jù)的分析處理,得到了合理的預(yù)應(yīng)力孔道摩擦偏差系數(shù)及預(yù)應(yīng)力摩阻損失規(guī)律。 - It's difficult to find deviation factor in a sentence. 用deviation factor造句挺難的